Cooling Water Pump Overhaul

  • From crate to commissioning
  • Rigged and set base on a precise elevation and position
  • Precisely leveled and prepped for epoxy grout
  • Grouted with Chockfast Red epoxy grout (87 units)
  • After full cure, rigged and set pump in place
  • Rigged 5.5-ton (11,000lb) motor and using a Versa Lift – set up on base pedestal
  • Laser aligned motor to pump, scribed motor feet positions, uncoupled, removed motor
  • Drilled and tapped motor feet positions
  • Reinstalled motor, coupled to pump, laser aligned and locked down