> USA
TurbinePROs is excited to be a part of two valuable conferences this January for the power industry! Stop by TurbinePROs' booths at EPRI TGUG in Amelia Island, FL and EGC in Bismarck, ND.
Meet our field services experts and learn more about our services for turbines and generators; how to best plan for outages; and maintaining your vital equipment.
Our expert field services team will be available to answer questions and provide valuable information about the maintenance, repair, and upgrade of your plant's rotating equipment.
EPRI Winter TGUG Jan 20-23, 2015 | TurbinePROs Booth #9 | Amelia Island, FL
Meet our experts at EPRI John Loubier, Vice President | Jeff Hogge, Operations Manager | Denis Graves, Sales Representative
Energy Generation Conference Jan 27-29, 2015 | TurbinePROs Booth #408 | Bismarck, ND
Meet our experts at EGC John Loubier, Vice President | Jeff Hogge, Operations Manager | Don Sebastian, Field Supervisor
We look forward to seeing you there!
Experience Power 2021 (formerly Electric Power) will be in-person this year with a comprehensive conference and speakers from utilities, OEMs, and operators covering the full energy chain for the power industry.
Leave with tactics to implement immediately to make your facility and infrastructure more resilient, more reliable, and more profitable.
Where:
San Antonio | TX Henry B. Gonzalez Convention Center
TurbinePROs is a proud Sponsor
Clean Currents 2021 is the all-new, official waterpower tradeshow + conference of the National Hydropower Association—promoted by North American waterpower to benefit the industry.
Conventional hydropower, pumped storage, small hydro and marine energy are already flexible and renewable clean energy sources. Clean Currents will showcase innovative solutions, thought leadership and exclusive educational opportunities to ensure that the advantages of hydropower remain relevant long into the future.
Where:
Atlanta, GA | Georgia World Congress Center
Due to deterioration and degradation of the original OEM unit, a run-of-the-river hydro plant sought an alternate solution to ensure optimal condition. TurbinePROs provided full refurbishment with engineering of a new head cover and manufacturing of new wicket gates. These modifications achieved greater output and enhanced operation post refurbishment compared to the original unit.