TurbinePROs Field & Specialty Services provides installation, repair, overhaul, maintenance, and modernizations for all rotating equipment including turbines, generators, pumps, compressors, and balance of plant in power generation and process plants. Whether it's scheduled or emergent, we work with you to meet your outage needs and schedules with a focus on safety first and quality.

From project managers, safety and quality managers, schedulers, technical advisors, and project engineers to field supervisors, skilled craft labor, and custom, containerized tools - we're ready to mobilize where you need us, when you need us.

Section Image

Safety & Quality

Our Work Smart - Go Home Safe protocol puts safety first. We believe every near miss, first aid, injury, lost time, accident, and quality issue can be avoided when protocol is followed.

As a testament to our committment to quality, our quality system is certified to the standards of ISO 9001:2015. 

Section Image

Case Studies

Learn more about the power generation and process plant projects that TurbinePROs has serviced. From inspections and technical direction to new installs, maintenance, repairs, and modernizations. 

Section Image

Experience

TurbinePROs' projects span North America and around the globe. Click to see just some of the steam, gas, nuclear, and hydro power generation and process plants that our field services support. 


GENERATOR INSPECTION | TESTING | CONDITION ASSESSMENT 

 TURBINEPROS IN-HOUSE GENERATOR SERVICES & CAPABILITIES 

Comprehensive Generator inspection, testing, and condition assessment

History of Maintenance & Services

Visual Inspection

Rotor

  • Shaft
  • Hub & Spider [especially high stress spider locations]         
  • Rim Support Ledge
  • Brake SegmentsScreenshot 2026 05 13 at 5.03.19 PM
  • Field Winding Connections
  • Amortisseur Winding
  • Exciter or Collector
  • Excitation Buss
Stator
  • End Winding
  • Jumper System
  • Blocking Arrangement & Lashing
  • Sole Plates

Air Gap Measurement 

In Field Silver Plating of Leads 

Electrical Tests

Performed to IEEE43-2000 Standards

Rotor
  • Pole Drop [120/240 vac] 
  • Insulation Resistance [PI/Megger] 
  • Winding Resistance
  • DC Step Test [absorption/ ramp]
  • DC High Potential Test, Phase-to-Phase, Phase-to-Ground
  • EL_CID [electromagnetic core imperfection detection] 
  • Core Loop Test
Stator
  • Insulation Resistance [PI/Megger] 
  • Winding Resistance
  • DC Step Test [absorption/ ramp]
  • DC High Potential Test, Phase-to-Phase, Phase-to-Ground
  • EL_CID [electromagnetic core imperfection detection] 
  • Core Loop Test

Rim Ledge Non-Destructive Examination

liquid penetrant & ultrasonic (as access permits)

Rim Ledge & Pole Attachment Remaining Life Assessments